N&T Industrial · Custom formulation
From signed brief to first qualified sample. Tuned to your plant's water, metals, throughput, and target performance — not a catalogue retrofit.
The 14-day process
The clock starts on signed brief. Days 1-14 cover brief through first qualified sample; production runs 28 days post sample sign-off.
Plant conditions (water, metals, throughput), target performance, regulatory geography, ingredient constraints, compliance targets.
Day 1Our R&D team selects base + actives + balance from the 1,000+ formula library, then tunes against your specific plant conditions.
Days 2-8Pilot quantity produced at the manufacturing site under the spec's exact conditions. Internal QA verification before sample dispatch.
Days 9-12First qualified sample ships to your plant for in-line trial. CoA + TDS + SDS + initial cost band accompany the sample.
Day 14Run the sample in your plant. Feedback drives 1-2 iteration cycles if needed. Each iteration: ~5-10 working days.
Buyer-pacedOnce the formulation passes plant-trial, scale to production batch. Lead time: 28 working days from sample sign-off.
28d post sign-offIndustry-typical lead time for custom industrial-chemicals formulation runs 4-12 weeks (4-6 for catalogue-adjacent tuning; 8-12 for novel chemistry). The 14-day SLA reflects three structural advantages in our manufacturing operation: a 1,000+ formula starting library (most briefs hit a close catalogue match in the first pass), a dedicated R&D team handling ~50 active briefs in parallel as a standing baseline, and ISO 9001-certified pilot production that doesn't bottleneck behind catalogue runs.
Custom formulation runs across all 9 industrial sectors — metalworking fluids, water-treatment chemicals, corrosion inhibitors, industrial cleaners, oil & gas, protective coatings, inorganic compounds, specialty fluids. Common briefs: regulatory swap (e.g., boron-free MWF migration), plant-condition tuning (water hardness, metals, temperature), cost-down formulation (per-tonne cost targeting), or performance-up formulation (higher throughput, longer fluid life, etc.).
Send the plant conditions, the target performance, and the regulatory geography. We confirm acceptance within 24 hours and the 14-day clock starts.